Diagnosis Procedure
1.CHECK CONNECTOR
2.CHECK HARNESS CONTINUITY (OPEN CIRCUIT)
3.CHECK HARNESS CONTINUITY (OPEN CIRCUIT)
Power supply and ground circuit
CLIMATE CONTROLLED SEAT CONTROL UNIT
CLIMATE CONTROLLED SEAT CONTROL UNIT : Diagnosis Procedure
Regarding Wiring Diagram information, refer to SE-44, "Wiring Diagram".
1.CHECK FUSES
2.CHECK BATTERY POWER SUPPLY CIRCUIT
Turn ignition switch OFF.
Disconnect climate controlled seat control ...
Drive belt
VQ35DE engine
1. Crankshaft pulley
2. Drive belt automatic tensioner pulley
3. Generator pulley
4. Air conditioner compressor pulley
WARNING
Be sure the ignition switch is placed in the
OFF or LOCK position before servicing
drive belt. The engine could rotate
unexpectedly.
1. Visually ...
Cluster lid A
Removal and Installation
REMOVAL
Using a suitable tool, gently remove the instrument side finisher
LH (1).
Remove the instrument lower panel LH (1).
Open the fuse block cover and remove the instrument lower panel
screw (A).
Disconnect the harness connectors and aspirator hose. ...